New design standards coming for river area
New design standards for construction in the State Highway 7 corridor got their first approval Tuesday night.
The Hutchinson City Council voted 4-1 to give preliminary approval to what is known as the River Overland District Design Standards and Boundaries ordinance. Final approval could come at the council’s May 13 meeting.
Mayor Steve Cook cast the lone dissenting vote. He questioned why the proposed district stretches from Fifth Avenue Northeast on the east to Shady Ridge Road on the west. He thought that was considerably larger than the original focus on the section between Bluff and Montana streets.
The standards are designed to encourage downtown district construction practices to tie the corridor to the river and downtown.
For more about the River Overlay District, read the April 24 print edition of the Leader.
(Terry Davis is a Hutchinson Leader staff writer. E-mail him at davis@hutchinsonleader.com.)
More Stories
7 Ways to Build a More Reliable Delivery Operation
As delivery volumes grow, small gaps can cause wider issues. Incomplete address details, unclear driver notes, late updates and missed...
The Business of Online Gambling in the UK: Growth, Regulation and the Road Ahead
Operators now compete on technology, customer experience and trust as much as on games and odds. Platforms such as BetWright...
Loops raises $3.5m to build an AI operating system for retailers
Loops, a San Francisco-based company that builds AI search, shopping assistance and customer service tools for brands and retailers, has...
Rent, don’t build: why Britain’s most heavily taxed sectors are buying their software off the shelf
Payroll costs have climbed since employer National Insurance rose to 15 per cent in April 2025, and sector-specific duties keep...
Fleeing London to Save on Tax? Your Housing Strategy is Delusional
The destination list is entirely predictable, with Dubai, Switzerland, and Singapore leading the charge. The underlying assumption fueling this trend...
Cabinet Office sets aside £38.5m for IR35 bill after HMRC ruling
The Cabinet Office has set aside £38.5m to cover unpaid tax on contractors after HM Revenue and Customs concluded the...
